Very well.
If that's the case (I'll check with Dimitris they don't take
any
shortcuts) we can have SPI 3.0 M1 in there. Even better ;)
Porting the SPI 3.0 to Beta 4 is not much effort i think.
/Heiko
On Thu, 2008-04-10 at 10:31 +0200, Thomas Diesler wrote:
> Heiko,
>
> Looking at
>
> http://jira.jb
oss.org/jira/browse/JBAS
>
> JBossAS-5.0.0.CR1 has 151 unresolved issues. Yesterday
I was under the
> impression that the release was imminent, but that was
obviously a false
> assumption. I think it's therefore unlikely that CR1
will come out in
> time before our code freeze.
>
> I changed the target version for 3.0.2 back to Beta4
>
> http://jbws.dyndns.org/mediawiki/ind
ex.php?title=Supported_Target_Containers
>
> cheers
> -thomas
>